Generator Interconnection Affected System Study Report for PJM Interconnection Cluster AD1 dated April 5, 2021

Date Received:
5/27/2021
Filing Date:
5/27/2021
Tracking Number::
F-EMP-20210527-027
Filed By:
Benjamin L Snowden
Attorney
Fox Rothschild LLP
434 Fayetteville Street
Suite 2800
Raleigh,  NC  27601
Telephone 1:  +1(919)719-1257
Telephone 1:  +1(919)755-8700
E-Mail:  bsnowden@foxrothschild.com
Means Received:
Internet

Synopsis:
Generator Interconnection Affected System Study Report for PJM Interconnection Cluster AD1 received by Applicants Sumac Solar LLC and Sweetleaf Solar LLC from Duke Energy Progress, LLC on April 20, 2021

Files:   (Click on the filename to open the file.)
2021-05-07 Letter to Clerk enclosing affected system study report [326.22KB]