Skip to main content
F-SP-20230608-017
Document Number: F-SP-20230608-017
Document Details
To view a document or form, you need Adobe Acrobat Reader.
Amended ROPC
Date Received:
6/8/2023
Filing Date:
6/8/2023
Tracking Number::
F-SP-20230608-017
Filed By:
Adrian Coward
,
E-Mail:
inspections@freedomsolarpower.com
Means Received:
Internet
Synopsis:
Install a 7.680kW AC roof-mounted solar PV system.
Files
:
(Click on the filename to open the file.)
Amended ROPC filing - Name Update
[184.09KB]
Updated Report of Proposed Construction (ROPC) notarized
[2,701.83KB]